Monthly Archives: September 2011

My Door is Up!

I finally have the door Up, but I wouldn’t say in.  I have to trim it out, which is tied in with window above it & the “Rafterets” I have to put across the front.   They will break up that … Continue reading

Posted in Plans | Leave a comment

1st Window In

We had another small HHH “heatwave”.  So I repainted in the shady sides, staying one side ahead of the sun.  Since it is now so closed in(I quit cutting the window holes out),  it is HOT inside & DARK!  So … Continue reading

Posted in Plans | Leave a comment

New color!

The Huge Tarp now leaks big time. Leaked like a sieve through Irene.  I had tossed some of the Zip panels up on the back end, & tacked them, but where ever it was only tarp, leaked bad.  Luckily I … Continue reading

Posted in Plans | Leave a comment

Front End Framing

I finished getting all the rafters up.  So I’m finally tieing in the front end framing.  I had to, to figure the edge of the first Zip system roofing panels.   The front is flat for about 5′, then falls back … Continue reading

Posted in Plans | Leave a comment

Front end Rafters

Finally have some of the front end Rafters up.  To get to them, I did a bunch of other stuff first, as I want to do as much of the work reaching over the top of the walls from the … Continue reading

Posted in Plans | 2 Comments

Trying to Close It in Better.

My weather in the summer comes from mostly  2 directions. the south over to the  Northwest.   So been working on closing those sides first. I have been hoarding this cute little cedar vent for about 30 yrs!   Finally I have … Continue reading

Posted in Plans | Leave a comment